Photo Credit: Getty Images
LOS ANGELES (CNS) - Fifteen full nights of partial and full directional closures of the San Diego (405) Freeway near Los Angeles International Airport are coming as a result of construction of a bridge for the Crenshaw/LAX Line light rail project, Metro announced today.
The closures are set to begin on July 31 and will feature overnight full or partial directional closures from 10 p.m. to 5 a.m. Monday to Friday, although the freeway will be fully open during the weekends.
The scheduled closures include:
-- The northbound lanes will be completely closed between Century and La Tijera boulevards from July 31 to Aug. 4.
-- Partial closure of the northboard and southbound high occupancy vehicle lanes and the 1 and 2 lanes from Aug. 7 to Aug. 11.
-- The southbound lanes will be fully closed between the La Cienega off- ramp and La Tijera on-ramp Aug. 14 to Aug. 18.